IMPORTANT BRIDGES
IMPORTANT BRIDGES
Sl. No. | PROJECT TITLE | MAXIMUM SPAN LENGTH | OWNER / CLIENT | CONSULTANT / CONTRACTOR CLIENT | PROJECT LOCATION | STATUS |
1 | Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch.165+092 to Ch.171+855 (North Bound) and from Ch.166+895 to Ch.173+638 (South Bound), excluding section from Ch.166+610 to Ch.167+150 (North Bound), Ch.168+425 to Ch.168+935 (South Bound) and Section from Ch.167+960 to Ch.168+168 (North Bound), Ch.169+745 to Ch.169+951 (South Bound) (Package-III) in the UT of Jammu & Kashmir on EPC mode | NHAI | CEIGALL India Ltd. | J&K, India | Ongoing |
2 | Selected Minor & Major Bridges for Four Lane Project Highway comprising section of NH-21 commencing from km. 12+750 to 26+500 & 126+500 to 158+500 i.e. Kiratpur-Nerchowk section in the state of Himachal Pradesh on EPC mode’ | NHAI | Gawar Construction Limited | Himachal Pradesh, India | Ongoing |
3 | Detailed Design of Bridge over river Yamuna & Betwa (Bundelkhand Expressway Package-V) from Saalabad (Dist. Jalaun) to Bakhariya (Dist. Auraiya) (Km. 200+00 to Km. 250+00) in the State of Uttar Pradesh on EPC Basis | NHAI | R K Infra | Uttar Pradesh, India | Ongoing |
4 | Four Laning of Existing Two lane with paved shoulder road from Talwandi Bhai to Ferozepur NH-05 (Old NH-95) from km.170.380 to km. 194.040 in State of Punjab | NHAI | CEIGALL India Ltd. | Punjab, India | Completed |
5 | Detailed Design Consultancy Service for High Level Bridge over River Teesta with approaches near Haldibari, connecting Mekhliganj with Par-Mekhliganj / Haldibari in the district of Coochbehar, West Bengal | PWD, W.B. | S. P. Singla Construction Pvt. Ltd. | West Bengal, India | Completed |
6 | Bridge over River Yamuna on Delhi – Meerut Expressway from Km 0.000 to Km 27.500 including 6/8 Laning of NH-24 from Km. 0.000 to Km. 49.346 (Hapur Bypass) in the State of Delhi and Uttar Pradesh – Package-1, in the State of Delhi | NHAI | Gawar Construction Ltd. | Delhi, India | Completed |
7 | Rehabilitation and Upgrading of Existing 2-lane road to 4/6 of Yamunanagar-Panchkula Section of NH-73 in the state of Haryana | NHAI | Gawar Construction Ltd. | Haryana, India | Completed |
8 | Detailed Design of High Level Bridge over Khushbhadra river in Odisha | R&B Orissa | S. P. Singla Construction Pvt. Ltd. | Orissa, India | Completed |
9 | Preparation of Detailed Design and Drawings of 10 Major Structures of National Highway 2 falling under District Bardhaman in the State of West Bengal | NHAI | IL&FS Transport Network Ltd. | West Bengal, India | Completed |
10 | Bridge over Yamuna near Geeta Colony, Delhi. Bridge Length 560m (Precast PSC T Girder of individual span Length 40.0m- 2 span continuous). | PWD, Govt. of NCT Delhi | PWD, Delhi | Delhi, India | Completed |
11 | Detailed Design of High Level Bridge over Sutlej River (Including Approaches) Crossing Nurpur Bedi Bunga Sahib Road at Sarai ka Pattan in Disst. Ropar | PWD, Punjab | S. P. Singla Construction Pvt. Ltd. | Punjab, India | Completed |
12 | 2 Bridges in Afghanistan for the project “REHABILITATION OF THE KANDHAR TO SPIN BOLDAK ROAD”. (Individual spans of 20m having precast girders and in-situ slab) | Ministry of Public Works, Kabul, Afganistan | Aarvee Associates | Afghanistan | Completed |
13 | Bridge over River Sutlej. | PWD, Punjab | V. K. Sood | Punjab, India | Completed |
14 | Bridge over Sirhind Canal. | Punjab Public Works Department. | Punjab, India | Completed | |
15 | Curved Loop III, Hebbal Flyover (Curved Continuous PSC Box Girder) | National Highway Authority of India & Bangalore Development Authority (In Association with RITES(I) Ltd.) | Karnataka, India | Completed | |
16 | Bridge over Beas at Harsipattan. Bridge Length 214.0m(Span Length 92.0m-continuous). | Public Works Department, Himachal Pradesh | Himachal Pradesh, India | Completed | |
17 | Bridge Over Pattamundai canal at Ch.13+719Km of NH-5A | National Highway Authority of India (In Association with Lea Associates South Asia Pvt. Ltd.) | Orissa, India | Completed | |
18 | Bridge Over Adhuria River at ch.123/1Km, Gujrat State Highway Project -2 | Gujrat State Highway Project -Project Coordinating Consultant.(In Association with Lea Associates South Asia Pvt. Ltd.) | Gujrat, India | Completed | |
19 | Bridge Over Rupen River at ch.82/2Km, Gujrat State Highway Project -2 | Gujrat State Highway Project -Project Coordinating Consultant.(In Association with Lea Associates South Asia Pvt. Ltd.) | Gujrat, India | Completed | |
20 | Bridge Over Pushpawati River at ch.90/1Km, Gujrat State Highway Project -2 | Gujrat State Highway Project -Project Coordinating Consultant.(In Association with Lea Associates South Asia Pvt. Ltd.) | Gujrat, India | Completed | |
21 | Bridge Over Goma River at ch.348/1Km, Gujrat State Highway Project -5 | Gujrat State Highway Project -Project Coordinating Consultant.(In Association with Lea Associates South Asia Pvt. Ltd.) | Gujrat, India | Completed | |
22 | Grade Separator at Ch.0+317, Four Lanning & Strengthening of MDR from Trichy Bypass to Madurai. (PSC Curved Continuous Box Girder) | National Highway Authority of India (In Association with Lea Associates South Asia Pvt. Ltd.) | Tamil Nadu, India | Completed | |
23 | Bridge Over Wagandhi River at ch.58.72Km, Nagpur – Adialabad Section | National Highway Authority of India (In Association with Lea Associates South Asia Pvt. Ltd.) | Maharastha, India | Completed | |
24 | RUB at Bhatinda in Punjab | Punjab Public Works Department. | Punjab, India | Completed | |
25 | Road Over Bridge at ch.37.418Km, Nagpur – Adialabad Section | National Highway Authority of India (In Association with Lea Associates South Asia Pvt. Ltd.) | Maharastha, India | Completed | |
26 | Remodelling of Laxmi Nagar Drain (1.5KM long) from Pump House Near L.M. BUND Office Complex To Shakkarpur More | Public Works Department, Govt. of NCT Delhi (In Association with RITES(I) Ltd.) | New Delhi, India | Completed | |
27 | Abutments & its foundations of four bridges in Trichy District | Public Works Department, Tamil Nadu (In Association with Scott Wilson Kirkpatrick & Co.Ltd.) | Tamil Nadu, India | Completed | |
28 | ROB at Jaipur Bypass – Phase I | National Highway Authority of India (In Association with RITES(I) Ltd.) | Rajasthan, India | Completed | |
29 | Semnala Bridge No. B-38a, Pallu – Hanumangarh Highway | Rajasthan Public Works Department | Rajasthan, India | Completed | |
30 | Widening of Bridge over Chirag Delhi Nallah on Outer Ring Road No. 7 | Public Works Department, Govt. of NCT Delhi | Delhi, India | Completed | |
31 | Spillway Bridge over Ambavane Dam # 5 near Pune | Sahara India Commercial Corporation Ltd. | Maharastra, India | Completed | |
32 | Bridge over Chamkor Drain. | Punjab Public Works Department. | Punjab, India | Completed | |
33 | Bridge over Old Sutlej drains & Kum drain. | Punjab Public Works Department. | Punjab, India | Completed | |
34 | Arch Bridge over Daroon Khad at R.D 8.765 in Himachal Pradesh (50.0m span open spandrel type arch) | Public Works Department, Himachal Pradesh | Himachal Pradesh, India | Completed | |
35 | Spillway Bridge over Dam # 3, Amba Valley Project, Pune | Sahara India Commercial Corporation Ltd. | Maharastra, India | Completed | |
36 | Construction of Box Drain with under-reamed piles at Khel Gaon Marg, Delhi | Public Works Department, Delhi | Delhi, India | Completed | |
37 | ROB at Ch.408/4-5, Four Lanning & Strengthening of MDR from Trichy Bypass to Madurai. | National Highway Authority of India (In Association with Lea Associates South Asia Pvt. Ltd.) | Tamil Nadu, India | Completed | |
38 | Bridge over River Parbati at Balu-Ra-Ghera. (Concrete deck over Steel Truss) | Public Works Department, Himachal Pradesh | Himachal Pradesh, India | Completed | |
39 | Pedestrian Subway & Vehicular Underpass near Ansal Plaza | Public Works Department, Govt. of NCT Delhi | New Delhi, India | Completed |