Cable Supported Bridges
CABLE SUPPORTED BRIDGES
Sl. No. | PROJECT TITLE | MAXIMUM SPAN LENGTH | OWNER / CLIENT | CONSULTANT / CONTRACTOR CLIENT | PROJECT LOCATION | STATUS |
1 | Detailed Design Consultancy Services for Construction of New Six lane Bridge including its approaches across River Ganga on NH-96 (New NH-330) at Phaphamau, Prayagraj in Uttar Pradesh on EPC mode | 200m | MORTH | S. P. Singla Constructions Pvt. Ltd. | Uttar Pradesh, India | Ongoing |
2 | Detailed Design Consultancy Services for Construction of new 4-lane Bridge (Parallel to the Existing MG Setu) with its approaches from km 0/000 to km 14/500 across river Ganga on NH-19 at Patna in the State of Bihar on EPC Mode | 242.130m | MORTH | S. P. Singla Constructions Pvt. Ltd. | Bihar, India | Ongoing |
3 | Detailed Design Consultancy & Engineering Services for “Construction of 4 Lane Elevated Corridor with Cable Stayed Bridge and approach road for Anna Chowk-Gobindpur Bypass Road at Jamshedpur (Total Length – 1540m) (EPC) Mode” | 110m | Advance Planning, Field Survey Division, Road Construction Department, Govt. of Jharkhand | S. P. Singla Constructions Pvt. Ltd. | Jharkhand, India | Ongoing |
4 | Detailed Design Consultancy & Engineering Services for “Construction of 4 lane Cable Stayed Road Over Bridge in lieu of existing Chandmari Road Over Bridge, including approaches, dismantling of existing Chandmari Road Over Bridge and other ancillary works in Howrah Station Area on Engineering, Procurement and Construction (EPC) Contract Mode” | 134m | Eastern Railway | S. P. Singla Constructions Pvt. Ltd. | West Bengal, India | Ongoing |
5 | Construction Stage Services for Detailed Design of “The Swap-Based Interchange in Flyover Construction at the Bailey Road, Patna, Bihar (SWAP-01) | 93m | BRPNNL | S. P. Singla Construction Pvt. Ltd. | Bihar, India | Completed |
6 | Construction Stage Services for Detailed Design of “The Swap-Based Interchange in Flyover Construction at the Bailey Road, Patna, Bihar (SWAP-03) | 50m | BRPNNL | S. P. Singla Construction Pvt. Ltd. | Bihar, India | Completed |
7 | Detailed Design of Bridge over River Ganga on Sultanganj-Aguwani Ghat Road, Bihar | 270m | BRPNN | S. P. Singla Construction Pvt. Ltd. | Bihar, India | Ongoing |
8 | Detailed Design of “The Swap-Based Interchange in Flyover Construction at the Bailey Road, Patna, Bihar (SWAP-01) | 93m | BRPNNL | Foundation for Innovation and Technology Transfer (FITT) | Bihar, India | Completed |
9 | Detailed Design of “The Swap-Based Interchange in Flyover Construction at the Bailey Road, Patna, Bihar (SWAP-03) | 50m | BRPNNL | Foundation for Innovation and Technology Transfer (FITT) | Bihar, India | Completed |
10 | Detailed Design of H.L Bridge Over River Hatania-Doania at 113.299km of NH-117 in the District of South 24-Parganas, W.B. (including Construction Stage Services) | 170m | PW (Roads) Directorate National Highway Wing, Govt. of W.B. | S. P. Singla Construction Pvt. Ltd. | West Bengal, India | Completed |
11 | Proof Checking of Main Span Superstructure (Extra dosed Type) of Paira Bridge (Labukhli Bridge), Bangaladesh | 200m | Ministry of Road Transport & Bridges, Bangladesh | ICT | Bangaladesh | Completed |