ELEVATED / VIADUCT

ELEVATED / VIADUCT

Sl. No.PROJECT TITLEMAXIMUM SPAN LENGTHOWNER / CLIENTCONSULTANT / CONTRACTOR
CLIENT
PROJECT LOCATIONSTATUS
1Construction of Elevated Corridor from Kargil Chowk to Science College via PMCH, on Ashok Rajpath (Two Lane Double Decker) in Patna on EPC Mode’BRPNNLR. K. INFRABihar, IndiaOngoing
2Consultancy Services for “Construction of elevated viaduct from end of Ghaziabad RRTS Station upto EPE crossing (including), elevated viaduct & Ramp for connection to Duhai Depot, including all special spans and two Nos. of Elevated RRTS Stations viz. Guldhar and Duhai [excluding Architectural Finishing & Roof structure of Stations] of Delhi – Meerut Regional Rapid Transit System Corridor” Package-2: DM/CN/COR-OF/027″NCRTCAPCO Inftratech Pvt. Ltd.Uttar Pradesh, IndiaOngoing
3Detailed Design Consultancy & Engineering Services for “Construction of 4 lane Cable Stayed Road Over Bridge in lieu of existing Chandmari Road Over Bridge, including approaches, dismantling of existing Chandmari Road Over Bridge and other ancillary works in Howrah Station Area on Engineering, Procurement and Construction (EPC) Contract Mode”Eastern RailwayS. P. Singla Constructions Pvt. Ltd.West Bengal, IndiaOngoing
4Detailed Design of Six laning & Strengthening of New NH-248A from existing Km. 2+740 (Rajiv Chowk) to Existing Km. 11+682 in Gurgaon under NHDP Phase IV on Hybrid Annuity Mode in the state of HaryanaNHAIOriental Structural Engineers Pvt. Ltd.Haryana, IndiaOngoing
5Detailed Design of Construction of Up-gradation to 4 Lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal Head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km Length in the State of Jammu and Kashmir to be Executed on EPC basis (Pkg-II)  NHIDCLS. P. Singla Construction Pvt. Ltd.J&K, IndiaOngoing
6Detailed Design Consultancy Services for Highway (and related component) Design of 4/6 Lanes Elevated Highway between Samrala Chowk to Ludhiana Municipal Limited in the State of Punjab NHAIGIL-SPSCPL JVPunjab, IndiaCompleted
7Detailed Design of Construction of 6-Laning of NH-2, From Allahabad Bypass to Varanasi (Handia-Varanasi Section)NHAIG R Infraprojects Ltd.Uttar Pradesh, IndiaCompleted
8Detailed Design of Delhi-Meerut Expressway Package-III “Six Laning from Existing Km. 27.740 to Existing km. 49.346 (Dasna to Hapur) in the State of Uttar Pradesh on Hybrid Annuity Mode”NHAIChetak Enterprises Ltd.Uttar Pradesh, IndiaCompleted
9Detailed Design of Four Laning of Chandigarh-Kharar Section from Sector-39 at Chandigarh to Kharar of NH-21 & NH-95 in the state of Punjab on EPC modeNHAILarsen & Toubro LimitedPunjab, IndiaCompleted
10Detailed Design of Four Lane with Paved Shoulder of Muzaffarnagar – Saharanpur via Deoband of SH-59 from Km. 0.000 to Km. 52.950 in the State of Uttar Pradesh on DBFOT basisUttar Pradesh State Highway AuthorityAPCO Inftratech Pvt. Ltd.Uttar Pradesh, IndiaCompleted
11Detailed Design and Drawings for Construction of Flyover at Derabassi from KM 29.830 to KM 30.970 of NH-22 (Ambala – Chandigarh Section)NHAIGawar Construction Ltd.Chandigarh, IndiaCompleted
12Design Consultancy Services for H.L Bridge Over River Hatania-Doania in West BengalPW (Roads) Directorate National Highway Wing, Govt. of W.B.S. P. Singla Construction Pvt. Ltd.West Bengal, IndiaCompleted
13Detailed Design of 4/6 laning of Varanasi – Shaktinagar corridor of SH-05A on DBFOT basisUttar Pradesh State Highway AuthorityACP Tollways Pvt. Ltd.Uttar Pradesh, IndiaCompleted
14Design & Engineering for New 4 Lane Elevated Road from Chennai Port to Maduravoyal port connectivity project on NH-4NHAISoma Enterprise Ltd.Chennai, IndiaCompleted
15Detailed Design of approaches to Flyover Bridge near Tata Motors, Sector-11, 12 & 16 Junction on Spine Road, PunePCNTDAJMC Project (I) Ltd.Pune, IndiaCompleted