EXPRESSWAY
EXPRESSWAY
Sl. No. | PROJECT TITLE | MAXIMUM SPAN LENGTH | OWNER / CLIENT | CONSULTANT / CONTRACTOR CLIENT | PROJECT LOCATION | STATUS |
1 | Detailed Design Consultancy Services for “Construction of 4 Lane Bangalore-Chennai Expressway from Km. 96+000 (Baireddypalle) to Km. 127+000 (Bangarupalem) Section in the State of Andhra Pradesh under Bharatmala on Hybrid Annuity Mode (Phase-II / Package-II)” | NHAI | APCO Inftratech Pvt. Ltd. | Andhra Pradesh, India | Ongoing |
2 | Detailed Design Consultancy Services for “Construction of access controlled Nagpur – Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) in the state of Maharashtra on EPC mode for Package -05, (from km. 217+023 to km. 259+900) (section – Village kinhirja to village kcnwad) in district Washim” | Maharashtra State Road Development Corporation Ltd. | Nakkshatra Design & Consultants LLP | Maharashtra, India | Ongoing |
3 | Consultancy Services for Detailed Design of “Development of Gorakhpur Link Expressway Project (Package I) -From Jaitpur (Dist. Gorakhpur) to Fulwariya (Dist. Ambedkar Nagar) (Km -0+817 to Km 47+500) in the State of Uttar Pradesh” | Uttar Pradesh Expressway Industrial Development Authority | APCO Inftratech Pvt. Ltd. | Uttar Pradesh, India | Ongoing |
4 | Consultancy Services for – “Eight Lane access-controlled Expressway starting near Junction with NH-11 to Start of ROB near junction with NH-11A (Ch. 183.000 – 214.260) section of Delhi-Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan” | NHAI | R K Infra | Rajasthan, India | Ongoing |
5 | Design of Flyover at Ch. 7+000 on Delhi – Meerut Expressway from Km 0.000 to Km 27.500 including 6/8 Laning of NH-24 from Km. 0.000 to Km. 49.346 (Hapur Bypass) in the State of Delhi and Uttar Pradesh – Package-1, in the State of Delhi | NHAI | Gawar Construction Ltd. | Uttar Pradesh, India | Ongoing |
6 | Development of Purvanchal Expressway Project (Package-III) from Jaraikala (Dist. Amethi) to Sidhi Ganeshpur (Dist. Sultanpur) (Km. 79+900 to Km. 121+600) in the State of Utter Pradesh on EPC Basis | NHAI | APCO Inftratech Pvt. Ltd. | Uttar Pradesh, India | Ongoing |
7 | Providing Engineering, Design/Drawing for Construction of access controlled Eight Lane divided carriageway starting at Sohna-Gurugram Road (NH-248A) near Alipur Village and ends at Ch. 18+461 before KMP Expressway (Ch. 0+000) to Ch. 18+461) Section of Delhi-Vadodra Green Field Alignment (NH-148N) on EPC Mode under Bharatmala Priyojana in the State of Haryana (Package-I) | NHAI | APCO Inftratech Pvt. Ltd. | Uttar Pradesh, India | Ongoing |
8 | Providing Engineering, Design/Drawing for Construction of Eight Lane Expressway starting before KMP Expressway and ends at Ch. 7+000 near Khanpur Ghati (Km 18+500 to Km 47+000) Section of Delhi-Vadodra Green Field Alignment (NH-148N) on EPC Mode under Bharatmala Priyojana in the State of Haryana (Package-II) | NHAI | APCO Inftratech Pvt. Ltd. | Uttar Pradesh, India | Ongoing |
9 | Delhi-Meerut Expressway from Km. 0.000 to Km. 27.500 including 6/8 Laning of NH-24 from Km. 0.000 to Km. 49.346 (Hapur Bypass) in the State of Delhi and Uttar Pradesh Package-II from Existing Km. 8.360 to Existing km. 27.740 (UP Border to Dasna) in the State of Uttar Pradesh on Hybrid Annuity Mode | NHAI | APCO Inftratech Pvt. Ltd. | Uttar Pradesh, India | Ongoing |
10 | Bridge over River Yamuna on Delhi – Meerut Expressway from Km 0.000 to Km 27.500 including 6/8 Laning of NH-24 from Km. 0.000 to Km. 49.346 (Hapur Bypass) in the State of Delhi and Uttar Pradesh – Package-1, in the State of Delhi | NHAI | Gawar Construction Ltd. | Delhi, India | Completed |
11 | Detailed Design of Delhi-Meerut Expressway Package-III “Six Laning from Existing Km. 27.740 to Existing km. 49.346 (Dasna to Hapur) in the State of Uttar Pradesh on Hybrid Annuity Mode” | NHAI | Chetak Enterprises Ltd. | Uttar Pradesh, India | Completed |
12 | Six Lane Extern Peripheral Expressway (NH no. NE-II) in the State of Haryana and Uttarpradesh on EPC Mode (Package-V from Km. 93.00 to Km. 114.00 )- Bridge over River Yamuna | NHAI | Oriental Structural Engineers Pvt. Ltd. | Uttar Pradesh, India | Completed |
13 | Design Consultancy of ROB at Ch 88+415 – 8 Lane for Green Field Firozabad to Etawah (km. 53.5 to 115.5) Access Controlled Expressway with service road in state of Uttar Pradesh of EPC basis (Package-II) | Uttar Pradesh Expressway Industrial Development Authority | Afcons Infrastructure Ltd | Uttar Pradesh, India | Completed |
14 | Detailed Design of approaches to 2 Interchange at Ch. 0+ 000 & Ch. 165+000 of Yamuna Expressway | Jaypee Infratech Ltd. | Vijay Nirman Company Pvt. Ltd. | Uttar Pradesh, India | Completed |
15 | Development of 4/6 Lane KMP Expressway in the state of Haryana –Grade Separator at NH-1 & NH-10 KMP Intersection | HSIDC | DS Construction | Haryana, India | Completed |