Sl. No. | PROJECT TITLE | MAXIMUM SPAN LENGTH | OWNER / CLIENT | CONSULTANT / CONTRACTOR CLIENT | PROJECT LOCATION | STATUS |
1 | Proof Checking & Rehabilitation of 630 m long 4-Lane major bridge & river training/guide bund works over River Yamuna near village Manjhawali, Distt. Faridabad on road from Faridabad to Greater Noida via Jassana, Manjhawali& Atta Gujran in the state of Haryana ISC Scheme of CRF on EPC Mode | Haryana, PWD | S. P. Singla Construction Pvt. Ltd. | Haryana, India | Ongoing |
2 | Consultancy Services for Condition Assessment and Preparation of the Detailed Project Report (DPR) for Repair, and Retrofitting Works of Ambedkar Bridge (both Old & New) over SWF&DWF Channel (Connecting Science City and VIP Bazar) | Kolkata Metropolitan Development Authority | — | Kolkata, India | Ongoing |
3 | Consultancy Services for Condition Assessment and Preparation of the Detailed Project Report (DPR) for Repair and Retrofitting works of Chingrighata Bridge, Kolkata | Kolkata Metropolitan Development Authority | — | Kolkata, India | Ongoing |
4 | Consultancy Services for Condition Assessment and Preparation of the Detailed Project Report (DPR) for Repair and Retrofitting works of Baghajatin ROB, Kolkata | Kolkata Metropolitan Development Authority | — | Kolkata, India | Ongoing |
5 | Detailed Design Consultancy Services for Six Laning of Samakhiali-Gandhidham (Km. 306.02 to Km. 362.16) in the State of Gujarat on DBFOT basis – Analysis, Design scheme, Working Methodology, Condition Survey & Inspection | NHAI | L&T Samakhiali Gandhidham Tollway Ltd. | Gujrat, India | Completed |
6 | Proof Checking of Balance of 317.50 meter Span Prestressed Concrete Cantilever Bridge at Bagchhal over Govind Sagar Reservoir on Panjpiri, Kutehla Bagchhal Road at RD 4/950 (Phase-II) in Dist. Bilaspur | HP, PWD | Gammon India Ltd. | Himachal Pradesh, India | Completed |
7 | Detailed Design Services for Rehabilitation of old Ghaggar Bridge on ambala Chandigarh section | NHAI | GMR Infrastructure Limited | Punjab, India | Completed |
8 | Detailed Design Services for Checking of Existing Design and providing a rehabilitation proposal along with Complete Design for Construction of Bridge at Gaundali in Goa | Goa State Infrastructure Development Corporation Ltd. | S. P. Singla Construction Pvt. Ltd. | Goa, India | Completed |
9 | Detailed Design Services for Repair & Rehabilitation of old Major Bridge over River Sone near Chopan | Uttar Pradesh State Highway Authority | ACP Tollways Pvt. Ltd. | Uttar Pradesh, India | Completed |
10 | Consultancy Services for Re-Design of Twin Cell PSC Segmental Box Girder Superstructure for the balance Spans between Pier P27 to A1 with new segments and Spans between P34 to P27 with already cast segments for the Bridge over River Koshi near Vijayghat in the District of Bhagalpur, Bihar | Bihar Rajya Pul Nirman Nigam Ltd | S. P. Singla Construction Pvt. Ltd. | Bihar, India | Completed |
11 | Detailed Design Services for Repair & Rehabilitation of balanced Cantilever Bridges of Sarhind Canal & Bhakra Canal at NH-1 | NHAI | Soma Enterprise Ltd. | Punjab, India | Completed |
12 | Feasibility Study and Detailed Project Report for Rehabilitation of Existing Bridge and Construction of new Bridge (350m) at Badarpur Ghat over River Barak near Badarpur in Assam on NH-44 for execution on EPC Model under JICA | MORTH | Sugam Technocrats Pvt. Ltd. | Silchar, Assam, India | Completed |
13 | Improvement of balance works of Ranchi Ring Road Section VII (Package ID : RRR VII), length 23.575 km to be developed into 6 lane divided carriageway with paved shoulder configuration in the state of Jharkhand | Jharkhand Accelerated Road Development Programme | APCO Inftratech Pvt. Ltd. | Jharkhand, India | Completed |