1 | Consultancy Srvices for ROB at Ch. 22+800 for “Construction of 4 Lane Bridge with Foothpath across River Ganga between Sultanganj (Dist. Bhagalpur) and Aguwani Ghat (Dist. Khagaria) including navigational span of Cable Stayed and Approaches (connection NH-31 & NH-80) in the State of Bihar” | BRPNNL | S. P. Singla Construction Pvt. Ltd. | Bihar, India | Ongoing |
2 | Detailed Design Consultancy & Engineering Services for “Construction of 4 lane Cable Stayed Road Over Bridge in lieu of existing Chandmari Road Over Bridge, including approaches, dismantling of existing Chandmari Road Over Bridge and other ancillary works in Howrah Station Area on Engineering, Procurement and Construction (EPC) Contract Mode” | Eastern Railway | S. P. Singla Constructions Pvt. Ltd. | West Bengal, India | Ongoing |
3 | ROB at Railway KM. 1030/10-12 between Railway Station Anoopganj and Bakkas @ Expressway design Ch. 1 +070 – Development of Purvanchal Expressway from Chand Sarai in Lucknow district to Sansara in Barabanki district (0. 270 km to 40.200 km) on Lucknow – Sultanpur Section on Purvanchal Expressway Project in UP on EPC mode | UPEIDA | Gayatri Projects Limited | Uttar Pradesh, India | Ongoing |
4 | ROB at Railway KM. 1003/15 between Railway Station Trivediganj and Haidargarh @ Expressway design Ch. 31 +064 – Development of Purvanchal Expressway from Chand Sarai in Lucknow district to Sansara in Barabanki district (0. 270 km to 40.200 km) on Lucknow – Sultanpur Section on Purvanchal Expressway Project in UP on EPC mode | UPEIDA | Gayatri Projects Limited | Uttar Pradesh, India | Ongoing |
5 | Detailed Design for 3 ROB’s at Vallah (In Lieu of L-xing No.S-28 at Km.506.027), Bhandari Bridge (Extension of Bhandari Bridge at Km.510/22) and Islamabad (L-xing No.B-22 at Km.513.358) in Amritsar District | Amritsar Improvement Trust | Ganesh Kartikey Construction Pvt. Ltd. | Punjab, India | Completed |
6 | Dismantling Scheme for Fatehpur ROB & Lalganj ROB of Raebereli-Banda Highway project, U.P. | NHAI | Constructora Sanjose S.A. | Uttar Pradesh, India | Completed |
7 | Providing Engineering, Design/Drawing for Construction of access controlled Eight Lane divided carriageway starting at Sohna-Gurugram Road (NH-248A) near Alipur Village and ends at Ch. 18+461 before KMP Expressway (Ch. 0+000) to Ch. 18+461) Section of Delhi-Vadodra Green Field Alignment (NH-148N) on EPC Mode under Bharatmala Priyojana in the State of Haryana (Package-I) | NHAI | APCO Inftratech Pvt. Ltd. | Uttar Pradesh, India | Ongoing |
8 | Detailed Design for Proposed ROB’s at Makhu to Arifke near village Padhri at Design Ch. 4+070 & Near village Sudhara at Design Ch. 12+280 and Minor Bridges at Ch. 3+070 & Ch. 6+655 in the state of Punjab on EPC mode | PWD, Punjab | CEIGALL India Ltd. | Punjab, India | Completed |
9 | Development of Purvanchal Expressway Project (Package-III) from Jaraikala (Dist. Amethi) to Sidhi Ganeshpur (Dist. Sultanpur) (Km. 79+900 to Km. 121+600) in the State of Uttar Pradesh on EPC Basis – ROB at Ch. 120+675 | NHAI | APCO Inftratech Pvt. Ltd. | Uttar Pradesh, India | Completed |
10 | Delhi-Meerut Expressway from Km. 0.000 to Km. 27.500 including 6/8 Laning of NH-24 from Km. 0.000 to Km. 49.346 (Hapur Bypass) in the State of Delhi and Uttar Pradesh Package-II from Existing Km. 8.360 to Existing km. 27.740 (UP Border to Dasna) in the State of Uttar Pradesh on Hybrid Annuity Mode | NHAI | APCO Inftratech Pvt. Ltd. | Uttar Pradesh, India | Completed |
11 | ROB including its Approaches of Existing Level crossing No. S-26 at Km. 235.240 of NH-15 (New -54) near Kotkapura in the State of Punjab on EPC Mode | PWD, Punjab | Brahamputra Inrastructure Ltd. | Punjab, India | Completed |
12 | ROB at Level Crossing on A-12 near Amritsar City in the State of Punjab on EPC Mode | PWD, Punjab | Brahamputra Inrastructure Ltd. | Punjab, India | Completed |
13 | 4 Lane ROB & Its Approaches including Railway Portion at Ch. 198.05 on Talwandi Bhai-Ferozepur Section of NH-95 (New NH-05) in the State of Punjab on EPC Mode | PWD, Punjab | Brahamputra Inrastructure Ltd. | Punjab, India | Completed |
14 | Design Consultancy of ROB at Ch 88+415 – 8 Lane for Green Field Firozabad to Etawah (km. 53.5 to 115.5) Access Controlled Expressway with service road in state of Uttar Pradesh of EPC basis (Package-II) | Uttar Pradesh Expressway Industrial Development Authority | Afcons Infrastructure Ltd | Uttar Pradesh, India | Completed |
15 | Detailed Design of Railway Bridge of 18.6m Span (c/c of Bearing), prestressed concrete I-Girder (Post Tensioned Type) of restricted height to 25t-2008 Loading for project Bridge No. 327 on Mansa-Bathinda Doubling Project (overall length of Girder 19.80m) | Northern Railway | Shiva Construction Co. | Punjab, India | Completed |
16 | Detailed Design of ROB at Ch. 0+290 for 4/6 laning of Varanasi – Shaktinagar corridor of SH-05A on DBFOT basis | Uttar Pradesh State Highway Authority | ACP Tollways Pvt. Ltd. | Uttar Pradesh, India | Completed |
17 | Detailed Design of ROB at Ch. 58+900 for 4/6 laning of Varanasi – Shaktinagar corridor of SH-05A on DBFOT basis | Uttar Pradesh State Highway Authority | ACP Tollways Pvt. Ltd. | Uttar Pradesh, India | Completed |
18 | Detailed Design of ROB at Ch. 86+100 for 4/6 laning of Varanasi – Shaktinagar corridor of SH-05A on DBFOT basis | Uttar Pradesh State Highway Authority | ACP Tollways Pvt. Ltd. | Uttar Pradesh, India | Completed |
19 | Detailed Design of ROB at Ch. 94+050 for 4/6 laning of Varanasi – Shaktinagar corridor of SH-05A on DBFOT basis | Uttar Pradesh State Highway Authority | ACP Tollways Pvt. Ltd. | Uttar Pradesh, India | Completed |
20 | Detailed Design of RUB at Ch. 81+550 for 4/6 laning of Varanasi – Shaktinagar corridor of SH-05A on DBFOT basis | Uttar Pradesh State Highway Authority | ACP Tollways Pvt. Ltd. | Uttar Pradesh, India | Completed |
21 | Preparation of Detailed Design and Drawings of 10 Major Structures of National Highway 2 falling under District Bardhaman in the State of West Bengal | NHAI | IL&FS Transport Network Ltd. | West Bengal, India | Completed |
22 | Detailed Design consultancy for ROB @ Ch. 144+746 on Four Laning of Godhra to Gujarat / M.P Border Section of NH-59 from Km. 129.300 to Km. 215.900 in the State of Gujarat on DBFOT basis under NHDP, Phase-III | NHAI | BSCPL Infrastructure Ltd. | Gujrat, India | Completed |
23 | Detailed Design consultancy for ROB @ Ch. 167+324 on Four Laning of Godhra to Gujarat / M.P Border Section of NH-59 from Km. 129.300 to Km. 215.900 in the State of Gujarat on DBFOT basis under NHDP, Phase-III | NHAI | BSCPL Infrastructure Ltd. | Gujrat, India | Completed |
24 | Detailed Design Consultancy for ROB @ Ch. 171+300 on Four Laning of Godhra to Gujarat / M.P Border Section of NH-59 from Km. 129.300 to Km. 215.900 in the State of Gujarat on DBFOT basis under NHDP, Phase-III | NHAI | BSCPL Infrastructure Ltd. | Gujrat, India | Completed |
25 | Proof Checking of Four Laning of Godhra to Gujarat / Madhya Pradesh Border Section of NH-59 from Km. 129.300 to Km. 215.900 in the State of Gujarat under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) basis | NHAI | BSCPL Infrastructure Ltd. | Gujrat, India | Completed |
26 | Preparation of Detailed Designs and Drawings of ROB at Ch. 159+772 on Moradabad-Bareilly Section of NH-24 in Uttar Pradesh (under NHAI) | NHAI | IL&FS Transport Network Ltd. | Uttar Pradesh, India | Completed |
27 | Preparation of Detailed Designs and Drawings of ROB at Ch. 165+402 on Moradabad-Bareilly Section of NH-24 in Uttar Pradesh (under NHAI) | NHAI | IL&FS Transport Network Ltd. | Uttar Pradesh, India | Completed |
28 | Preparation of Detailed Designs and Drawings of ROB at Ch. 189+138 on Moradabad-Bareilly Section of NH-24 in Uttar Pradesh (under NHAI) | NHAI | IL&FS Transport Network Ltd. | Uttar Pradesh, India | Completed |
29 | Preparation of Detailed Designs and Drawings of ROB at Ch. 216+685 on Moradabad-Bareilly Section of NH-24 in Uttar Pradesh (under NHAI) | NHAI | IL&FS Transport Network Ltd. | Uttar Pradesh, India | Completed |
30 | Preparation of Detailed Designs and Drawings of ROB at Ch. 234+900 on Moradabad-Bareilly Section of NH-24 in Uttar Pradesh (under NHAI) | NHAI | IL&FS Transport Network Ltd. | Uttar Pradesh, India | Completed |
31 | Preparation of Detailed Designs and Drawings of ROB at Ch. 246+438 on Moradabad-Bareilly Section of NH-24 in Uttar Pradesh (under NHAI) | NHAI | IL&FS Transport Network Ltd. | Uttar Pradesh, India | Completed |
32 | Detailed Design of approaches to ROB (including Railway Portion) at Km 65/405 on Delhi Bhatinda Railway Line on Rohtak, Haryana | HUDA | S. P. Singla Construction Pvt. Ltd. | Haryana, India | Completed |